Project Oasis

A design-build, fast-tracked renovation of two buildings totaling 465,000+ SF into highly sustainable offices and cutting edge laboratory space. This renovation will support server development and operations for the client’s acquisition of a large x86 server division. Multiple lab/datacenter spaces included highly efficient eSYNC’s and CDU’s system with hot aisle containment. Other labs included CRAH units for cooling of server loads, chilled water connections for high density in-rack cooling, raised access flooring, lab benches, fume hoods. Amenities and upgrades included a cafeteria, fitness center, wellness center, smoke evacuation system, café, shipping and receiving areas. The project also included secure access including hardware, MDF, IDF teledata and labs.
This project received LEED Gold Certification.

Mission Critical Industry Excellence Coordinator: Greg Botteon | | 410.821.1100