BRESCO - APC Retrofit

Furnished and installed air pollution control equipment, including structural modifications to the existing building, installation of
new drag and screw conveyors, fly ash conditioning equipment, three-spray dryer absorbers and associated ductwork, three silos for lime storage, slaking and injection point delivery, one silo for powder actuated carbon storage and injection point delivery, two 750 CFM air compressors, a dilution water storage tank (fabricated on-site), and all associated pumps, piping, instrumentation,
controls and electrical gear. Modifications were performed in a fully operational power plant, requiring extensive coordination for
tie-ins of new equipment to the existing systems.