PORTFOLIO

Romark Logistics, Inc.

Design and construction of a 522,000 SF temperature-controlled distribution warehouse including:
• Precast insulated wall panels
• 7" and 8" non-reinforced concrete floor slabs
• Deep dynamic compaction (DDC) of existing site
• 40F and 70F temperature controlled storage rooms
• Ammonia refrigeration with humidity control

Warehouse Industry Excellence Coordinator: Kevin Seicke | | 410.821.1100

Copyright 2012 The Whiting-Turner Contracting Company