Eleanor Murray Fallon
Middle School

This two-phased project on a 26-acre 13-building site included nine classroom buildings, an administrative building, and a media, multipurpose kitchen/ cafeteria, and gymnasium building. The construction included one football field, a track, eight outdoor basketball courts, covered walkways, covered outdoor lockers, and a covered shelter for outdoor lounging. All of the buildings are constructed of masonry block and steel.

© Copyright 2012 The Whiting-Turner Contracting Company