Clark County Water Reclamation District
Primary Effluent Pump Station Phase III
Design/build of a wastewater pump station expansion to increase the existing primary effluent pump station peak flow pumping capacity from 120 MGD to 320 MGD. The project included tying into the existing wet well without causing shutdowns to the operating facility. Work also included a new control system to incorporate the new pumps and the old pumps in the system.